Commit Graph

13 Commits

Author SHA1 Message Date
shen
22bb86959c docs(08): create phase plans for image display fix and pagination cache
3 plans covering QUAL-01 through QUAL-04:
- 08-01: pagination cache key + wiring into rendering pipeline
- 08-02: unified 1080x1920 max-size for all images, footnote width-only fix
- 08-03: pagination timing instrumentation

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-23 18:43:41 +08:00
shen
86e6922f7b docs(08): create phase plan — image display fix, cache stub, perf sampling
Three plans for Phase 8 (分页质量、缓存与性能采样):
- 08-01: Pagination cache key struct and manager stub (QUAL-01)
- 08-02: Unified 1080x1920 max-size constraint for all images, footnote width-only sizing (QUAL-02, QUAL-03, QUAL-04)
- 08-03: Pagination timing instrumentation with [EPUB][Perf] diagnostic output (QUAL-04)

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-23 18:30:56 +08:00
shen
26afb9f7dc docs(08): research image display fix for pagination quality
Research Phase 8 plan 08-02: image display fix in the native text
rendering path. Documents the unified max-size approach (1080x1920),
footnote width-only sizing, and three entry points that need changes.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-23 18:27:08 +08:00
shen
d7339aa255 feat(07): close native text pagination semantics loop 2026-05-22 20:39:26 +08:00
shen
21c8bbb23a docs(07): create phase plan 2026-05-22 20:04:47 +08:00
shen
46fa9fceff docs(06): create phase plan 2026-05-22 14:20:33 +08:00
shen
7b5c77cedd docs(06): capture phase context 2026-05-22 14:10:58 +08:00
shen
bd4978266a docs: start milestone v1.1 WXRead 深化对齐 2026-05-22 13:59:26 +08:00
shen
5698aeaead chore: checkpoint current milestone work 2026-05-22 13:28:53 +08:00
shen
6d196d64e5 docs(phase-01): add planning artifacts 2026-05-21 22:00:41 +08:00
shen
0870996ed0 docs(phase-01): complete phase execution 2026-05-21 22:00:21 +08:00
shen
6d7f02debd docs(01-02): complete refactor entry strategy plan 2026-05-21 21:58:52 +08:00
shen
cc2573552c docs(01-01): complete current engine audit plan 2026-05-21 21:56:54 +08:00