milestone audited status scores nyquist gaps tech_debt
v1.0 2026-05-22T05:32:00Z gaps_found
requirements phases integration flows
1/10 5/5 3/3 4/4
compliant_phases partial_phases missing_phases overall
1
2
3
4
5
partial
requirements integration flows
id status phase claimed_by_plans completed_by_plans verification_status evidence
REND-01 unsatisfied Phase 2
02-02-PLAN.md
02-03-PLAN.md
partial 02-VERIFICATION.md only marks REND-01 as partial; REQUIREMENTS.md remains unchecked; no SUMMARY frontmatter claims completion.
id status phase claimed_by_plans completed_by_plans verification_status evidence
REND-02 partial Phase 2
02-01-PLAN.md
02-02-PLAN.md
02-03-PLAN.md
passed 02-VERIFICATION.md marks REND-02 satisfied, but REQUIREMENTS.md remains unchecked and no SUMMARY frontmatter records completion.
id status phase claimed_by_plans completed_by_plans verification_status evidence
REND-03 orphaned Phase 3
03-01-PLAN.md
03-02-PLAN.md
03-03-PLAN.md
orphaned Phase 3 summary/verifications describe page metadata and paginator work, but no Phase 3 VERIFICATION requirements table maps back to REND-03 and REQUIREMENTS.md remains pending.
id status phase claimed_by_plans completed_by_plans verification_status evidence
REND-04 orphaned Phase 3
03-02-PLAN.md
03-03-PLAN.md
orphaned Phase 3 runtime evidence proves stronger pagination, but no requirement-level verification entry or checked-off requirement exists for REND-04.
id status phase claimed_by_plans completed_by_plans verification_status evidence
COMP-01 orphaned Phase 4
04-01-PLAN.md
orphaned Phase 4 verification describes restored reader entry flow, but no explicit requirement table or summary frontmatter marks COMP-01 complete.
id status phase claimed_by_plans completed_by_plans verification_status evidence
COMP-03 orphaned Phase 4
04-02-PLAN.md
orphaned Search/highlight/restore behavior is evidenced in Phase 4, but not reconciled into REQUIREMENTS.md or requirement-level verification records.
id status phase claimed_by_plans completed_by_plans verification_status evidence
COMP-04 orphaned Phase 4
04-03-PLAN.md
orphaned ROADMAP and summaries say RDReaderView stayed untouched, but milestone requirement tracking never marks COMP-04 complete.
id status phase claimed_by_plans completed_by_plans verification_status evidence
STAB-01 orphaned Phase 5
05-01-PLAN.md
orphaned 05-VERIFICATION.md shows a 5-book matrix across required categories, but no requirement table or checked requirement ties that evidence to STAB-01.
id status phase claimed_by_plans completed_by_plans verification_status evidence
STAB-02 orphaned Phase 5
05-02-PLAN.md
orphaned 05-VERIFICATION.md shows no crash/blank-page regressions in sampled flows, but milestone requirement tracking never records STAB-02 as satisfied.
phase items
01-current-engine-boundaries
01-VALIDATION.md remains draft with pending Wave 0 sign-off and nyquist_compliant false.
phase items
02-typesetter-css
02-VALIDATION.md remains draft with pending Wave 0 sign-off and nyquist_compliant false.
02-VERIFICATION.md leaves REND-01 only partial even though later phases likely complete the milestone intent.
phase items
03-page-metadata-pagination
03-VALIDATION.md has nyquist_compliant true but all task rows and sign-off remain pending.
03-VERIFICATION.md lacks a requirement coverage section for REND-03 / REND-04.
phase items
04-reader-capabilities
04-VALIDATION.md has no frontmatter compliance markers.
04-VERIFICATION.md lacks requirement-level mapping for COMP-01 / COMP-03 / COMP-04.
Residual risk notes admit no full interactive UI automation for TOC/highlight/search.
phase items
05-regression-stability
05-VALIDATION.md documents the matrix but not Nyquist frontmatter compliance.
05-VERIFICATION.md lacks requirement-level mapping for STAB-01 / STAB-02.
Residual risk notes admit no fully automated UI walkthrough of every sample/interaction.

Milestone v1.0 Audit

Result

Status: gaps_found

The implementation milestone appears substantively complete at the phase and runtime-evidence level, but the milestone does not pass the strict close-out gate because requirement bookkeeping was never reconciled after execution. Under the required 3-source cross-reference, only COMP-02 is fully satisfied.

Scope

  • Milestone: v1.0
  • Phases in scope: 01 through 05
  • Completed phases: 5/5
  • Verification files present: 5/5
  • Summary files present: 13/13

Phase Audit

Phase Verification Summary Coverage Audit Result
1 present, passed 2/2 pass
2 present, passed 3/3 pass with requirement bookkeeping gap
3 present, runtime evidence strong 3/3 pass with orphaned requirement gap
4 present, runtime evidence strong 3/3 pass with orphaned requirement gap
5 present, runtime evidence strong 2/2 pass with orphaned requirement gap

Requirements Cross-Reference

Requirement Traceability Verification Summary Frontmatter Final
COMP-02 Complete satisfied in Phase 1 listed in 01 summaries satisfied
REND-02 Pending satisfied in Phase 2 not listed partial
REND-01 Pending partial in Phase 2 not listed unsatisfied
REND-03 Pending no requirement table entry not listed orphaned
REND-04 Pending no requirement table entry not listed orphaned
COMP-01 Pending no requirement table entry not listed orphaned
COMP-03 Pending no requirement table entry not listed orphaned
COMP-04 Pending no requirement table entry not listed orphaned
STAB-01 Pending no requirement table entry not listed orphaned
STAB-02 Pending no requirement table entry not listed orphaned

Interpretation:

  • The code and runtime evidence strongly suggest several orphaned requirements were actually delivered.
  • The milestone audit still fails because REQUIREMENTS.md, *-VERIFICATION.md, and requirements-completed summary metadata do not agree.
  • This is a close-out gap, not necessarily an implementation gap.

Integration Check

Cross-phase integration appears healthy from the shipped evidence:

  • Phase 2 chapter preprocessing and CSS layering feed the Phase 3 paginator path.
  • Phase 3 offset-compatible pagination semantics feed Phase 4 reader restore/search/highlight behavior.
  • Phase 5 validates native reflowable, fixed/interactive WebKit, and TXT from the same demo/runtime surface.

No cross-phase wiring break or broken end-to-end flow was evidenced in the verification artifacts.

Runtime / E2E Evidence

Observed milestone-level evidence from Phase 3-5 verification:

  • EPUB 资源验证2/2 通过
  • 分页诊断:宝山辽墓材料与释读 ...
  • 恢复诊断:宝山辽墓材料与释读 ...
  • 样本验证5/5 通过
  • 矩阵[Fixed/互动] 2/2
  • 矩阵[TXT] 1/1

These support the claim that the milestone behavior is broadly working, but they do not by themselves satisfy the workflow's requirement-traceability gate.

Nyquist Coverage

Phase VALIDATION.md Compliance Notes
1 present partial draft, nyquist_compliant: false
2 present partial draft, nyquist_compliant: false
3 present partial nyquist_compliant: true, but task/sign-off rows remain pending
4 present partial validation doc exists, but no frontmatter compliance markers
5 present partial validation doc exists, but no frontmatter compliance markers

Why This Fails Close-Out

The milestone close workflow requires all of the following to align:

  1. REQUIREMENTS.md checkboxes and traceability statuses
  2. phase VERIFICATION.md requirement coverage
  3. phase SUMMARY.md requirements-completed frontmatter

That alignment is missing for 9 of 10 requirements.

  1. Reconcile the requirement evidence into the existing phase artifacts:
    • add requirement coverage sections where missing in Phases 3-5
    • update requirements-completed frontmatter in relevant summaries
    • update .planning/REQUIREMENTS.md checkboxes and traceability statuses
  2. Run $gsd-validate-phase 1, $gsd-validate-phase 2, $gsd-validate-phase 3, $gsd-validate-phase 4, $gsd-validate-phase 5 if you want Nyquist compliance brought up to date before close-out.
  3. Re-run $gsd-audit-milestone.

Bottom Line

The milestone looks operationally complete, but it is not archive-ready under the workflows audit rules because the requirement evidence chain is incomplete.