ReadViewSDK/.planning/v1.0-MILESTONE-AUDIT.md
2026-05-22 13:52:47 +08:00

208 lines
9.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
milestone: v1.0
audited: 2026-05-22T05:32:00Z
status: gaps_found
scores:
requirements: 1/10
phases: 5/5
integration: 3/3
flows: 4/4
nyquist:
compliant_phases: []
partial_phases: [1, 2, 3, 4, 5]
missing_phases: []
overall: partial
gaps:
requirements:
- id: "REND-01"
status: "unsatisfied"
phase: "Phase 2"
claimed_by_plans: ["02-02-PLAN.md", "02-03-PLAN.md"]
completed_by_plans: []
verification_status: "partial"
evidence: "02-VERIFICATION.md only marks REND-01 as partial; REQUIREMENTS.md remains unchecked; no SUMMARY frontmatter claims completion."
- id: "REND-02"
status: "partial"
phase: "Phase 2"
claimed_by_plans: ["02-01-PLAN.md", "02-02-PLAN.md", "02-03-PLAN.md"]
completed_by_plans: []
verification_status: "passed"
evidence: "02-VERIFICATION.md marks REND-02 satisfied, but REQUIREMENTS.md remains unchecked and no SUMMARY frontmatter records completion."
- id: "REND-03"
status: "orphaned"
phase: "Phase 3"
claimed_by_plans: ["03-01-PLAN.md", "03-02-PLAN.md", "03-03-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "Phase 3 summary/verifications describe page metadata and paginator work, but no Phase 3 VERIFICATION requirements table maps back to REND-03 and REQUIREMENTS.md remains pending."
- id: "REND-04"
status: "orphaned"
phase: "Phase 3"
claimed_by_plans: ["03-02-PLAN.md", "03-03-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "Phase 3 runtime evidence proves stronger pagination, but no requirement-level verification entry or checked-off requirement exists for REND-04."
- id: "COMP-01"
status: "orphaned"
phase: "Phase 4"
claimed_by_plans: ["04-01-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "Phase 4 verification describes restored reader entry flow, but no explicit requirement table or summary frontmatter marks COMP-01 complete."
- id: "COMP-03"
status: "orphaned"
phase: "Phase 4"
claimed_by_plans: ["04-02-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "Search/highlight/restore behavior is evidenced in Phase 4, but not reconciled into REQUIREMENTS.md or requirement-level verification records."
- id: "COMP-04"
status: "orphaned"
phase: "Phase 4"
claimed_by_plans: ["04-03-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "ROADMAP and summaries say RDReaderView stayed untouched, but milestone requirement tracking never marks COMP-04 complete."
- id: "STAB-01"
status: "orphaned"
phase: "Phase 5"
claimed_by_plans: ["05-01-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "05-VERIFICATION.md shows a 5-book matrix across required categories, but no requirement table or checked requirement ties that evidence to STAB-01."
- id: "STAB-02"
status: "orphaned"
phase: "Phase 5"
claimed_by_plans: ["05-02-PLAN.md"]
completed_by_plans: []
verification_status: "orphaned"
evidence: "05-VERIFICATION.md shows no crash/blank-page regressions in sampled flows, but milestone requirement tracking never records STAB-02 as satisfied."
integration: []
flows: []
tech_debt:
- phase: "01-current-engine-boundaries"
items:
- "01-VALIDATION.md remains draft with pending Wave 0 sign-off and nyquist_compliant false."
- phase: "02-typesetter-css"
items:
- "02-VALIDATION.md remains draft with pending Wave 0 sign-off and nyquist_compliant false."
- "02-VERIFICATION.md leaves REND-01 only partial even though later phases likely complete the milestone intent."
- phase: "03-page-metadata-pagination"
items:
- "03-VALIDATION.md has nyquist_compliant true but all task rows and sign-off remain pending."
- "03-VERIFICATION.md lacks a requirement coverage section for REND-03 / REND-04."
- phase: "04-reader-capabilities"
items:
- "04-VALIDATION.md has no frontmatter compliance markers."
- "04-VERIFICATION.md lacks requirement-level mapping for COMP-01 / COMP-03 / COMP-04."
- "Residual risk notes admit no full interactive UI automation for TOC/highlight/search."
- phase: "05-regression-stability"
items:
- "05-VALIDATION.md documents the matrix but not Nyquist frontmatter compliance."
- "05-VERIFICATION.md lacks requirement-level mapping for STAB-01 / STAB-02."
- "Residual risk notes admit no fully automated UI walkthrough of every sample/interaction."
---
# Milestone v1.0 Audit
## Result
Status: `gaps_found`
The implementation milestone appears substantively complete at the phase and runtime-evidence level, but the milestone does **not** pass the strict close-out gate because requirement bookkeeping was never reconciled after execution. Under the required 3-source cross-reference, only `COMP-02` is fully satisfied.
## Scope
- Milestone: `v1.0`
- Phases in scope: `01` through `05`
- Completed phases: `5/5`
- Verification files present: `5/5`
- Summary files present: `13/13`
## Phase Audit
| Phase | Verification | Summary Coverage | Audit Result |
|-------|--------------|------------------|--------------|
| 1 | present, `passed` | 2/2 | pass |
| 2 | present, `passed` | 3/3 | pass with requirement bookkeeping gap |
| 3 | present, runtime evidence strong | 3/3 | pass with orphaned requirement gap |
| 4 | present, runtime evidence strong | 3/3 | pass with orphaned requirement gap |
| 5 | present, runtime evidence strong | 2/2 | pass with orphaned requirement gap |
## Requirements Cross-Reference
| Requirement | Traceability | Verification | Summary Frontmatter | Final |
|-------------|--------------|--------------|---------------------|-------|
| COMP-02 | Complete | satisfied in Phase 1 | listed in 01 summaries | satisfied |
| REND-02 | Pending | satisfied in Phase 2 | not listed | partial |
| REND-01 | Pending | partial in Phase 2 | not listed | unsatisfied |
| REND-03 | Pending | no requirement table entry | not listed | orphaned |
| REND-04 | Pending | no requirement table entry | not listed | orphaned |
| COMP-01 | Pending | no requirement table entry | not listed | orphaned |
| COMP-03 | Pending | no requirement table entry | not listed | orphaned |
| COMP-04 | Pending | no requirement table entry | not listed | orphaned |
| STAB-01 | Pending | no requirement table entry | not listed | orphaned |
| STAB-02 | Pending | no requirement table entry | not listed | orphaned |
Interpretation:
- The code and runtime evidence strongly suggest several orphaned requirements were actually delivered.
- The milestone audit still fails because `REQUIREMENTS.md`, `*-VERIFICATION.md`, and `requirements-completed` summary metadata do not agree.
- This is a close-out gap, not necessarily an implementation gap.
## Integration Check
Cross-phase integration appears healthy from the shipped evidence:
- Phase 2 chapter preprocessing and CSS layering feed the Phase 3 paginator path.
- Phase 3 offset-compatible pagination semantics feed Phase 4 reader restore/search/highlight behavior.
- Phase 5 validates native reflowable, fixed/interactive WebKit, and TXT from the same demo/runtime surface.
No cross-phase wiring break or broken end-to-end flow was evidenced in the verification artifacts.
## Runtime / E2E Evidence
Observed milestone-level evidence from Phase 3-5 verification:
- `EPUB 资源验证2/2 通过`
- `分页诊断:宝山辽墓材料与释读 ...`
- `恢复诊断:宝山辽墓材料与释读 ...`
- `样本验证5/5 通过`
- `矩阵[Fixed/互动] 2/2`
- `矩阵[TXT] 1/1`
These support the claim that the milestone behavior is broadly working, but they do not by themselves satisfy the workflow's requirement-traceability gate.
## Nyquist Coverage
| Phase | VALIDATION.md | Compliance | Notes |
|-------|---------------|------------|-------|
| 1 | present | partial | draft, `nyquist_compliant: false` |
| 2 | present | partial | draft, `nyquist_compliant: false` |
| 3 | present | partial | `nyquist_compliant: true`, but task/sign-off rows remain pending |
| 4 | present | partial | validation doc exists, but no frontmatter compliance markers |
| 5 | present | partial | validation doc exists, but no frontmatter compliance markers |
## Why This Fails Close-Out
The milestone close workflow requires all of the following to align:
1. `REQUIREMENTS.md` checkboxes and traceability statuses
2. phase `VERIFICATION.md` requirement coverage
3. phase `SUMMARY.md` `requirements-completed` frontmatter
That alignment is missing for 9 of 10 requirements.
## Recommended Closure Path
1. Reconcile the requirement evidence into the existing phase artifacts:
- add requirement coverage sections where missing in Phases 3-5
- update `requirements-completed` frontmatter in relevant summaries
- update `.planning/REQUIREMENTS.md` checkboxes and traceability statuses
2. Run `$gsd-validate-phase 1`, `$gsd-validate-phase 2`, `$gsd-validate-phase 3`, `$gsd-validate-phase 4`, `$gsd-validate-phase 5` if you want Nyquist compliance brought up to date before close-out.
3. Re-run `$gsd-audit-milestone`.
## Bottom Line
The milestone looks operationally complete, but it is **not archive-ready** under the workflows audit rules because the requirement evidence chain is incomplete.