9.3 KiB
| milestone | audited | status | scores | nyquist | gaps | tech_debt | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| v1.0 | 2026-05-22T05:32:00Z | gaps_found |
|
|
|
|
Milestone v1.0 Audit
Result
Status: gaps_found
The implementation milestone appears substantively complete at the phase and runtime-evidence level, but the milestone does not pass the strict close-out gate because requirement bookkeeping was never reconciled after execution. Under the required 3-source cross-reference, only COMP-02 is fully satisfied.
Scope
- Milestone:
v1.0 - Phases in scope:
01through05 - Completed phases:
5/5 - Verification files present:
5/5 - Summary files present:
13/13
Phase Audit
| Phase | Verification | Summary Coverage | Audit Result |
|---|---|---|---|
| 1 | present, passed |
2/2 | pass |
| 2 | present, passed |
3/3 | pass with requirement bookkeeping gap |
| 3 | present, runtime evidence strong | 3/3 | pass with orphaned requirement gap |
| 4 | present, runtime evidence strong | 3/3 | pass with orphaned requirement gap |
| 5 | present, runtime evidence strong | 2/2 | pass with orphaned requirement gap |
Requirements Cross-Reference
| Requirement | Traceability | Verification | Summary Frontmatter | Final |
|---|---|---|---|---|
| COMP-02 | Complete | satisfied in Phase 1 | listed in 01 summaries | satisfied |
| REND-02 | Pending | satisfied in Phase 2 | not listed | partial |
| REND-01 | Pending | partial in Phase 2 | not listed | unsatisfied |
| REND-03 | Pending | no requirement table entry | not listed | orphaned |
| REND-04 | Pending | no requirement table entry | not listed | orphaned |
| COMP-01 | Pending | no requirement table entry | not listed | orphaned |
| COMP-03 | Pending | no requirement table entry | not listed | orphaned |
| COMP-04 | Pending | no requirement table entry | not listed | orphaned |
| STAB-01 | Pending | no requirement table entry | not listed | orphaned |
| STAB-02 | Pending | no requirement table entry | not listed | orphaned |
Interpretation:
- The code and runtime evidence strongly suggest several orphaned requirements were actually delivered.
- The milestone audit still fails because
REQUIREMENTS.md,*-VERIFICATION.md, andrequirements-completedsummary metadata do not agree. - This is a close-out gap, not necessarily an implementation gap.
Integration Check
Cross-phase integration appears healthy from the shipped evidence:
- Phase 2 chapter preprocessing and CSS layering feed the Phase 3 paginator path.
- Phase 3 offset-compatible pagination semantics feed Phase 4 reader restore/search/highlight behavior.
- Phase 5 validates native reflowable, fixed/interactive WebKit, and TXT from the same demo/runtime surface.
No cross-phase wiring break or broken end-to-end flow was evidenced in the verification artifacts.
Runtime / E2E Evidence
Observed milestone-level evidence from Phase 3-5 verification:
EPUB 资源验证:2/2 通过分页诊断:宝山辽墓材料与释读 ...恢复诊断:宝山辽墓材料与释读 ...样本验证:5/5 通过矩阵[Fixed/互动] 2/2矩阵[TXT] 1/1
These support the claim that the milestone behavior is broadly working, but they do not by themselves satisfy the workflow's requirement-traceability gate.
Nyquist Coverage
| Phase | VALIDATION.md | Compliance | Notes |
|---|---|---|---|
| 1 | present | partial | draft, nyquist_compliant: false |
| 2 | present | partial | draft, nyquist_compliant: false |
| 3 | present | partial | nyquist_compliant: true, but task/sign-off rows remain pending |
| 4 | present | partial | validation doc exists, but no frontmatter compliance markers |
| 5 | present | partial | validation doc exists, but no frontmatter compliance markers |
Why This Fails Close-Out
The milestone close workflow requires all of the following to align:
REQUIREMENTS.mdcheckboxes and traceability statuses- phase
VERIFICATION.mdrequirement coverage - phase
SUMMARY.mdrequirements-completedfrontmatter
That alignment is missing for 9 of 10 requirements.
Recommended Closure Path
- Reconcile the requirement evidence into the existing phase artifacts:
- add requirement coverage sections where missing in Phases 3-5
- update
requirements-completedfrontmatter in relevant summaries - update
.planning/REQUIREMENTS.mdcheckboxes and traceability statuses
- Run
$gsd-validate-phase 1,$gsd-validate-phase 2,$gsd-validate-phase 3,$gsd-validate-phase 4,$gsd-validate-phase 5if you want Nyquist compliance brought up to date before close-out. - Re-run
$gsd-audit-milestone.
Bottom Line
The milestone looks operationally complete, but it is not archive-ready under the workflow’s audit rules because the requirement evidence chain is incomplete.